Quantcast
Channel: SCN: Message List
Browsing all 8566 articles
Browse latest View live

SAP Router Error:

Hi All, I configured SAP router, but unable to connect to SAP. Attached file for dev_rout trace file. Please do the needful as soon as possible. Thanks & Regards Ahsan

View Article


Re: create SION & scheme master in EXIM india

sounds like an add-on.can you post a link to this configuration document, or at least tell how it is named?

View Article


About kernel files reflecting to additional instances

Hi techies, I would like to know how the kernel files will get reflected to additional instances when we do a kernel upgrade.

View Article

Re: PI 7.4

Just looking for future direction of the product... we currently have java stack only. So PI 7.4 can run on NW 7.3 Ehp1..? Again.. I I can find under roadmaps for anything related to PI.. is only for...

View Article

Re: Derived week commencing from date

Hi Pawan, Try this field routine code. DATA: L_WEEK TYPE KWEEK,      L_DATE TYPE SY-DATUM,      F_DATE TYPE SY-DATUM,      DAY_NO TYPE SCAL-INDICATOR.      L_DATE =...

View Article


Re: Make a parameter a table type.

Hi Elena, Create a table type in SE11 with the line type crmd_orderadm_i and assign that table type to the exporting parameter ex_item_no.

View Article

Re: Role was not found in ARM

Hi Ameet, Thanks for the reply Yes . Its not in complete status.I dont know how to proceed it further . , the next button is greyed out  there . I think I have to complete the 4 stages still to see the...

View Article

Re: Make a parameter a table type.

Hi, Yes, but if I make the t_item_no same as ex_item_no then I cannot pick the values inside it as I want to.and the parameter there is no option to make it type table of. How can I go around this, and...

View Article


Image may be NSFW.
Clik here to view.

Re: Role was not found in ARM

Hi Colleen, No I didnt blank that out of the screen shot. I have done the configuration in IMG and done the BC set activationh prior to creation of the role .. By the way : Did you catch that fish  (...

View Article


The executable R3trans in /usr/sap/SID/SUM/abap/exe is too old.

Hi all,  I am doing SAP EHP5 to EHP7 upgrade using SUM10. In Extraction phase am getting the error, " The executable R3trans in /usr/sap/SID/SUM/abap/exe is too old. It needs a release date of 06.06.14...

View Article

Re: SAP Enterprise Portal

Hi Gobi  What do you want to start? tell us the requirement in details way RegardsSriram

View Article

Re: Can you associate an XML Schema with a DataWindow?

I think I hate XML. I also noticed that XML samples provided by the client, per XMLSpy, are valid. But the Schema doesn't like zero or "" values in some of the tags.  So in their example if WaitTime is...

View Article

Re: The executable R3trans in /usr/sap/SID/SUM/abap/exe is too old.

Hello Rachit, First, ../abap/exe contains the target version kernel so 721 is wrong kernel. You should download latest 741 R3trans (I hope this is the release u selected in MOPZ, if you are not sure...

View Article


Re: The executable R3trans in /usr/sap/SID/SUM/abap/exe is too old.

Download latest Kernel, extract it and copy R3* files from there. Refer similar thread SUM 1.0 SP07 - R3trans in /usr/sap/<SID>/SUM/abap/exe is too old.

View Article

Image may be NSFW.
Clik here to view.

Re: Change Class Type

Cool.. might be a good topic for a document for the QM forum if you get a chance!   Craig

View Article


Re: BSI Tax Factory 10.0

Hello all, I have read many responses from this thread. Can you please confirm if I need to complete below customizing changes form Phase 2..are these mandatory ? Can somebody elaborate on these ? We...

View Article

Re: How to see the version management of standard text created in SO10

Thanks i did found the way ... to work with z* prog. But still i welcome any inputs for version management of SO10.

View Article


Re: Automatic Firming Of Planned Orders Without Using Planning Time Fence

Hello Oscar The only functionality to automatically firm planned orders created by MRP is the planning time fence, with a proper MRP type.  Depending on the firming type defined for your MRP type...

View Article

Re: Extract all the values from a Bex measure in formula

Thanks for your response Naga! The logic that I need to implement is the following: 1) if [ZCALMTO] contains only one entry that of a "#" then perform some calculation inside a report formula that has...

View Article

Image may be NSFW.
Clik here to view.

Transporting - Maintenance View dgv_tdg27 entries

Hi All, I am working on maintenance view dgv_tdg27 with below given details.    Delivery Class:           While creating an entry, it should ask for transport request, which i am not getting. Can...

View Article
Browsing all 8566 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>